abopart mobilwände
abopartmbmKL
ACOUSTIC optimized by abopart
abopart sieht fern
Cédric Gustin
Co2 Bilanz Aktiv
Lothar Göhring, Kerstin Wohlfarth, Alexander Stehmeier, Sonja Kuhlmann, Roxana-Anna Suligowski
CityCube Berlin – The construction progress
Kindergarten Pfaffenhofen an der Roth
Singapur - Great Year and abopart
Kindertagesstätte in Stühlingen

 June 2017    Bad Zwischenahn / Petersfehn


      Since the last year we cooperate with Mediterranean Building Materials.
      Established in Abu Dhabi, UAE in 1992, Mediterranean Building Materials
      has becomeever since a Key Player and a Leader in the Production, Supply
      and Installation of Specialized Construction Related Products. Over
      this period of time MBM has been associated with well-established
      manufactures across the world to provide sustainable solutions for
      the ever growing Middle Eastern construction industry in terms
      of Architectural andInfrastructural products.
      Meanwhile they also operate in Lebanon, Jordan, Dubai, Quatar and Oman.
      We look forward to a continued successful cooperation.


  March 2015   Bad Zwischenahn / Petersfehn

      Spring is coming and it will not take long time until summer
      will be also here.

      The Krandelbad Wildeshausen is, especially in the summer, the perfect
      place for the whole family. Because of the large outdoor swimming area
      everyone will find the right spot.
      With the support of abopart products, also the indoor pool can be optimally
      used in the summer. Parts of the large glass front can be opened so there
      is even more light in the indoor pool area.
      Also for the winter our outdoor products are ideally, thanks to the thermal
      separation they work like a winter garden. The heat stays inside.
      

      Our frame glass walls make this possible!

  March 2015   Bad Zwischenahn / Petersfehn

      abo]sign - ACOUSTIC optimized by abopart

      abo]sign – plan your rooms now with sound
      insulated movable design partitions

      



      Click here for more information (7 MB)
abo]sign – plan your rooms now with sound insulated movable design partitions

  March 2015   Bad Zwischenahn / Petersfehn

      we watch TV

      Nowadays, in planning your conference facilities a high
      grade of flexibility and the ideal use of the rooms is
      indispensable. The integration of audio/visual equipment
      is now made possible by abopart because monitors can be
      blended into our movable partitions. They can be operated
      wirelessly within the conference room.
      Thanks to the mobility of the partitions you can see
      clearly from each seat.

      Please send us your inquiry for new partitions or for a
      belated upgrade.

  January 2015   France - LE SYNDICAT / Bad Zwischenahn
      We welcome our new partner in France, Mr. Cédric Gustin from
      INTELLISPACE. Mr. Gustin has long years of experience and we are looking
      forward to a fruitful cooperation. Good luck!

      Depuis le 1er Janvier 2015 nous nous félicitons d’avoir un nouveau
      partenaire en France. Nous souhaitons, avec fierté, la bienvenue à Monsieur
      Cédric Gustin de la société INTELLISPACE. Mr. Gustin possède une longue
      expérience dans les domains de la vente, la promotion ainsi que la
      prescription de nos produits. Savoirs et connaissances qui sont dès à
      présent mis en oeuvre dans l‘intérêt de nos clients et utilisateurs.
      Dès à présent nous nous réjouissons de cette situation ainsi que de
      notre développement et sommes persuadés d’une longue et fructueuse
      collaboration. Succès et bonne chance à Cédric.

  August 2014   Bad Zwischenahn / Petersfehn - Co2 balance active
      For about one year abopart runs its own generating plant. In addition to
      the heat which is used to stoke the production site and the offices the
      plant produces electric energy. Most of the ecologically produced energy
      is used for the company needs. The CO2 balance is perfect. But perfect
      is not goodenough. So our staff and guests have the chance to charge
      their electric bicycles at our charging station.
      Besides the motivation to use bikes instead of cars the charging station
      closed the ecological circle. Naturally the employees take part in the
      campaign: “Mit dem Rad zur Arbeit” of the health insurance AOK..

  New colleagues 2014
      Since March we hired some new colleagues.

      We are glad to work with:

      - Kerstin Wohlfarth (offer and order department)
      - Alexander Stehmeier (development)
      - Lothar Göhring (technical manager)
      - Sonja Kuhlmann (order department)
      - Roxana-Anna Suligowski (trainee)

      We wish all of them good luck!

  April 2014   CityCube Berlin
      The project CityCube Berlin is nearly finished.
      Here is an impression of the construction progress
      with abopart employees as actors.

      Watch the video: CityCube Berlin – The construction progress
      source: http://www.citycube-berlin.de



  February 2014  Bad Zwischenahn / Pfaffenhofen an der Roth
      Kindergarten Pfaffenhofen an der Roth
      A big playground can be created out of a region of non-operation by using
      the mobile walls of abopart. The open atmosphere provides a perfect
      insight for the staff and the needed space for adventures for the children.

Kindergarten Pfaffenhofen an der Roth

  October 2013  Bad Zwischenahn / Singapur
      From 14th until 16th October 2013 Great Year and abopart had a meeting
      in order to exchange experiences and discuss future strategies. The
      significance and the development of the Asian market as well as the
      implementation of the latest generation of movable partitions were the
      main topics of this meeting. abopart and Great Year intend to double
      the current total value order within the upcoming 3 years. This will be
      achieved by introducing new products and solutions and by being
      more seen and heard of in Asia.
Great Year and abopart

  June 2013  Bad Zwischenahn / Stühlingen
      Stühlingen (sbe): The available space of the new daycare facility for
      children: 1580 sqm. Outdoor area: 1300 sqm. There are three
      groups for children under 3, two groups for children from 3 to 6
      and two fulltime groups and one group for children from 6 to 14
      years. The budget was 3.7 million Euro. Nevertheless, it is expected
      that the final settlement will fall short of this amount. 62,5 % of these
      investments have been subsidized by the government. Otherwise, the
      small city of Stühlingen with its 5175 inhabitants would not have been
      capable to manage this project. From the 90ies on until 2011 the
      Frauenverein Stühlingen, who did pioneering work back then, was the
      organizing institution of the kindergarten, in 2012 the Caritasverband
      Hochrhein took over.

      Quelle: SÜDKURIER GmbH, Medienhaus, Konstanz